News‎ > ‎

New bridge at Pye Mill

posted 5 May 2016, 01:50 by Robert Burch   [ updated 6 May 2016, 01:20 ]
The old arched bridge at Pye Mill is being replaced by a pre-fabricated steel cantilever bridge with wooden handrails.  This is to reduce the likelihood of flooding upstream caused by water backing up against the arch of the old bridge.
Excavation for new bridge
Prefabricated bridge outside Churchill

Bridge complete




New roadway