Post date: May 5, 2016 8:50:17 AM
The old arched bridge at Pye Mill is being replaced by a pre-fabricated steel cantilever bridge with wooden handrails. This is to reduce the likelihood of flooding upstream caused by water backing up against the arch of the old bridge.